Bathroom renos: Day 7 and Day 8

22 02 2023

Not a lot to report. The 3 coats of waterproofing need a day to dry between each coat, so the first few days this week is just watching paint dry—literally!

Both the tiler and the project manager have been here for short stints on both days—the tiler to do the waterproofing and prep work for tiling (which starts tomorrow, Day 9!) and the PM to do small things, like patch holes in walls then sand down in preparation for the tiling and painting, vacuum the concrete floors with an industrial-strength vacuum cleaner, replace skirtings on the bedroom side of the en suite that were taken off to allow the doorway to be widened etc.

And the tiler has put up his plan for the floorboard-style tiles he’ll be laying on the floor.

 


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.




%d bloggers like this: