Bathroom renos: Day 18

10 03 2023

The frameless shower screen got fitted today (the silicone has to dry for about 24 hours) and the PM was here for several hours refitting the fittings he’d taken off for the painter, adding door furniture, hanging the siding doors, siliconing the toilet area (it’s now ready to use!), aligning the doors on the vanity and overhead cabinet, washing down the walls and floors to remove any chalky residue from the grout etc.

On Monday, the carpet layer comes to re-lay the bedroom carpet that was pulled up 4 weeks ago, then the PM will do the final silicone joints in the shower and the rest of the main bathroom, do a final clean and check, and then it will be ours, though we won’t be able to use the shower for another day while the silicone joint filler sets.

It’s been a long journey, but the initial design and every expectation that was set by the PM has been met, with no SANFUs along the way. I’m really pleased with how it’s turned out, the quality of the workmanship, the professionalism of everybody, and the respect they showed our property. I’d certainly use them again if I was to ever do this again.

Note: Some of the photos show the tiles darker than they actually are. They’re all quite light.


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.




%d bloggers like this: